Jesuit High School Baseball Field
Beaverton, Oregon
2006-2007
Project consisted of removal of existing grass baseball field, removal of 600 dump trucks of earth, base rock grading, sub-drainage installation, and placing, levelling and compacting the top rock.
View a slideshow of this project
|
 |
|
Kruse Oaks Phase II
Lake Oswego, Oregon
2005-2006
Contractor: Schiewe & Associates
Project work included mass grading for entire site and installation of site utilities and bioswales for a 5 story Class "A" building site with a 2 story underground parking garage. The Kruse office parks are widely recognized as the premier office buildings for the State of Oregon, are widely sought after and have quite surpassed that of Downtown Portland offices. |
 |
|
Kaiser Orchards Medical Office Building
Vancouver, Washington
2005-2006
Contractor: Brockamp & Jaeger
Project work included site grading and utility installation as well as off-site road and utility upgrades for a three story medical office building. This included full street construction on NE 137th Avenue and SR500. We also built four bioswales on this project and installed and maintained a completely self contained site erosion and sedimentation control system.

|
|
Oregon City H.S. Track Renovation
Oregon City, Oregon
Summer 2005
Contractor: Robinson Construction
Project consisted of removal of existing grass football field, re-grade, cement treat and install utilities for a new Field Turf football field. Project also included installation of 5600 LF of underground drainage piping.


|

 |
|
Providence Newberg Medical Center
Newberg, Oregon
2004 - 2005
Contractor: Skanska USA Building, Inc.
Utility and road expansion work to accommodate the new hospital
on Hwy 99W.
 |
 |
|
Target Sherwood Offsite Improvements Project
Sherwood, Oregon
2003 - 2004
Contractor: Skanska USA Building, Inc.
Utility and road expansion in order to accommodate the new Target
store.

|

 |
|
Tri-Met LIFT at 99th and Powell
Portland, Oregon
2002
Contractor: DPR Construction, Inc.
1 1/2 acre concrete parking lot and prep for new
building.
Underground utilities: water, sewer, storm.

|
 |
|
Dania Home Furnishings on the Sunset Highway
Beaverton, Oregon
2001
Contractor: Baugh - Skanska
Removed asphalt and concrete from the old lumberyard that use to
occupy the site. Recycled the 8,000 tons of asphalt and concrete
on site and used it for fill and parking lot subgrades.
Underground utilities: water, sewer, storm, electrical.
Landscape preparation. |
 |
|
Electro-Scientific Industries (ESI) on
Science Park Drive in Beaverton
Beaverton, Oregon
2001
Contractor: Schiewe & Associates
Excavation, backfill, and site prep for new 3-story
office building.
Tore out six existing parking lots; reconfigured,
rocked, and repaved for more efficient parking. |
 |
|
Kruse Woods V at I-5 and Kruse Way
Lake Oswego, Oregon
2000
Contractor: Schiewe & Associates
Survey and Plans.
Excavating and backfill to prep for 8-story office
building and associated underground parking garage.
Underground utilities: water, sewer, storm.
311 geo-piers

|
 |